PAN Chunrong, LONG Zhiqiang. Optimizing of time delay for multi-cluster tools[J]. Manufacturing Technology & Machine Tool, 2021, (10): 109-113. DOI: 10.19287/j.cnki.1005-2402.2021.10.022
Citation: PAN Chunrong, LONG Zhiqiang. Optimizing of time delay for multi-cluster tools[J]. Manufacturing Technology & Machine Tool, 2021, (10): 109-113. DOI: 10.19287/j.cnki.1005-2402.2021.10.022

Optimizing of time delay for multi-cluster tools

  • Aiming at the time delay optimization problem in multi-cluster tools, a time delay optimization model was established and the solving heuristic algorithm is developed. We first describe the steady state production process of multi-cluster tools. Based on this, the influence mechanism of time delay caused by robots waiting was analyzed, and then a robot waiting time allocation model to reduce time delay was established. An improved Multi-objective evolutionary algorithm based on decomposition-grey wolf optimizer (MOEA/D-GWO) algorithm was proposed to solving the model. Finally, examples were given to demonstrate the efficacy of the methodology.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return